51202329-302 | Honeywell | I/O Link Cable
Specifications
Manufacturer: Honeywell
Product No.: 51202329-302
Condition: 10 العناصر الموجودة في المخزون
Product Type: PLC Battery/Cable/Accessories
Payment:T/T, Western Union
Weight: 200g
Shipping port: Xiamen
Warranty: 12 months
تفاصيل المنتج
وصف
Configured for high-speed data transfer between field devices and master controllers in Series C architectures, the Honeywell 51202329-302 (51202329-302 I/O Link Cable) provides direct physical signal transmission and network communication execution.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 51202329-302 |
| Brand | Honeywell |
| Origin | United States |
| Weight | 0.11 kg (approx. 0.25 lbs) |
| Dimensions | Up to 30 meters length (9-inch pitch configuration) |
| Operating Temp | -20 deg C to 70 deg C |
| Power Consumption | Passive cabling component |
| Communication Speed | Up to 2.304 Mbps |
| Cable Type | Drop cable for I/O Link systems |
Honeywell DCS Process Control and Signal Communication
The assembly integrates within Honeywell Series C process control environments, maintaining rigorous channel-to-channel isolation and cold junction compensation (CJC) separation where applicable. Standard configuration supports 4-20 mA HART loop protocol compatibility alongside high-speed digital drop channels. Integrated shielding prevents electromagnetic interference (EMI) from corrupting data packets across multi-drop loops, ensuring deterministic bus communication and low-latency feedback transmission between field nodes and controller cards.
Frequently Asked Questions
Q: Does the 51202329-302 support hot-swapping on active controller networks?
A: Cabling adjustments must be performed with upstream loop power isolated to prevent communication dropouts or transient bus faults on connected Series C nodes.
Q: What is the maximum communication speed supported by this cable assembly?
A: The physical layer is engineered to support data transmission rates up to 2.304 Mbps under standard industrial operating conditions.
Field Installation Guidelines
- Verify that system power and communication loops are de-energized prior to routing and connecting the cable set between controller nodes and I/O assemblies.
- Route the cable along designated internal cabinet wireways, maintaining physical separation from high-voltage AC power lines to prevent induced noise coupling.
- Secure connector plugs firmly to terminal interfaces, ensuring locking mechanisms or retention screws are fully engaged to withstand industrial vibration environments.
كيفية الحصول على عرض أسعار
تتبع الطلب
شركات الشحن
سياسة وشروط الاسترداد
شروط الضمان
منتجات ذات صله
- يؤدي اختيار تحديد إلى تحديث كامل للصفحة.