FC-PSU-240516 CC V1.1 Honeywell Power Supply Module
Specifications
Manufacturer: Honeywell
Product No.: FC-PSU-240516 CC V1.1
Condition: 10 العناصر الموجودة في المخزون
Product Type: Power Supply Modules
Product Origin: USA
Payment:T/T, Western Union
Weight: 1300g
Shipping port: Xiamen
Warranty: 12 months
تفاصيل المنتج
وصف
The Honeywell FC-PSU-240516 CC V1.1, also cataloged as the FC-PSU-240516 Power Supply Unit, operates as a dedicated hardware component for 24 VDC conversion and power distribution within Honeywell Safety Manager platforms.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | FC-PSU-240516 CC V1.1 |
| Brand | Honeywell |
| Origin | USA |
| Operating Temp | -5 to +70 deg C |
| Power Consumption | Passive distribution and regulation losses |
| Output Voltage | 24 VDC |
| Output Current | 5 A |
| Conformal Coating | Yes (CC Variant) |
| Mounting Type | Chassis / Rack Mount |
Channel-to-Channel Isolation & Cold Junction Compensation
The internal power conversion circuitry provides galvanic isolation between incoming AC/DC supply lines and downstream system backplane logic. This isolation barrier prevents power rail electrical transients and ground loops from propagating to field I/O modules, maintaining output bus stability under high noise conditions. By suppressing supply noise ripple, the module protects sensitive 4-20 mA HART loop protocol instruments and eliminates voltage-induced offset errors across cold junction compensation (CJC) circuits in connected analog input hardware.
Frequently Asked Questions
Q: What does the "CC" designation indicate in the model number?
A: The "CC" designation specifies factory conformal coating, providing added physical defense against humidity, corrosive airborne contaminants, and harsh industrial environments.
Q: How does internal power rail isolation protect field I/O circuitry?
A: Isolation barriers prevent high-voltage spikes and differential ground currents on the primary power input from passing to internal system backplane logic or connected analog measurement loops.
Q: What mounting procedures must be followed to ensure thermal dissipation?
A: The power supply must be secured into its dedicated rack slot with adequate vertical ventilation clearance above and below the housing to facilitate natural convection cooling.
Field Installation Guidelines
- Align the power supply module with the chassis guide rails and push firmly until rear backplane connectors seat completely.
- Tighten front retention screws to secure the chassis assembly against industrial vibration and establish ground frame continuity.
- Verify that incoming mains power complies with specified voltage and current thresholds before energizing the module input.
- Route primary power input conductors away from sensitive low-voltage field signal cabling inside cabinet wireways.
- Connect the main protective earth (PE) ground terminal directly to the central cabinet grounding bus bar.
كيفية الحصول على عرض أسعار
تتبع الطلب
شركات الشحن
سياسة وشروط الاسترداد
شروط الضمان
منتجات ذات صله
- يؤدي اختيار تحديد إلى تحديث كامل للصفحة.