Honeywell 51202329-102 I/O Link Cable Set
Specifications
Manufacturer: Honeywell
Product No.: 51202329-102
Condition: 10 العناصر الموجودة في المخزون
Product Type: PLC Battery/Cable/Accessories
Payment:T/T, Western Union
Weight: 1500g
Shipping port: Xiamen
Warranty: 12 months
تفاصيل المنتج
وصف
Configured for high-performance communication between field devices and controller architectures in industrial automation networks, the Honeywell 51202329-102 (51202329-102) I/O Link Cable Set provides direct physical connectivity supporting up to 6 link devices and 2 redundant UIO IOTA assemblies.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 51202329-102 |
| Brand | Honeywell |
| Origin | United States |
| Weight | 0.1 kg |
| Dimensions | 1.5 meter length (6 inch pitch between drop points) |
| Operating Temp | -40 deg C to 85 deg C |
| Power Consumption | Passive cabling component |
| Device Capacity | Up to 6 I/O link drops |
| Interface Compatibility | Compatible with up to 2 redundant UIO IOTA |
Process Control and Signal Communication Interfaces
The assembly integrates within Honeywell process automation platforms, maintaining rigorous channel-to-channel isolation and signal integrity across distributed nodes. Standard configuration supports multi-drop communication loops where internal shielding prevents electromagnetic interference (EMI) from corrupting data packets. The physical wiring architecture ensures deterministic bus traversal without introducing latency or feedback degradation across the connected I/O modules.
Frequently Asked Questions
Q: Does the 51202329-102 support hot-swapping on active controller networks?
A: Cabling adjustments must be performed with upstream loop power isolated to prevent communication dropouts or transient bus faults on connected IOTA nodes.
Q: What is the maximum device drop limit supported by this cable set?
A: The harness accommodates up to 6 individual I/O link devices with a fixed 6-inch pitch between connection points.
Field Installation Guidelines
- Verify that system power and communication loops are de-energized prior to routing and connecting the cable set between controller nodes and UIO IOTA assemblies.
- Route the 1.5 meter cable along designated internal cabinet wireways, maintaining physical separation from high-voltage AC power lines to prevent induced noise coupling.
- Secure connector plugs firmly to terminal interfaces, ensuring locking mechanisms or retention screws are fully engaged to withstand industrial vibration environments.
كيفية الحصول على عرض أسعار
تتبع الطلب
شركات الشحن
سياسة وشروط الاسترداد
شروط الضمان
منتجات ذات صله
- يؤدي اختيار تحديد إلى تحديث كامل للصفحة.