51202329-302 | Honeywell | I/O Link Cable
Specifications
Manufacturer: Honeywell
Product No.: 51202329-302
Condition: 10 Items in Stock
Product Type: PLC Battery/Cable/Accessories
Payment:T/T, Western Union
Weight: 200g
Shipping port: Xiamen
Warranty: 12 months
Product details
Description
Configured for high-speed data transfer between field devices and master controllers in Series C architectures, the Honeywell 51202329-302 (51202329-302 I/O Link Cable) provides direct physical signal transmission and network communication execution.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 51202329-302 |
| Brand | Honeywell |
| Origin | United States |
| Weight | 0.11 kg (approx. 0.25 lbs) |
| Dimensions | Up to 30 meters length (9-inch pitch configuration) |
| Operating Temp | -20 deg C to 70 deg C |
| Power Consumption | Passive cabling component |
| Communication Speed | Up to 2.304 Mbps |
| Cable Type | Drop cable for I/O Link systems |
Honeywell DCS Process Control and Signal Communication
The assembly integrates within Honeywell Series C process control environments, maintaining rigorous channel-to-channel isolation and cold junction compensation (CJC) separation where applicable. Standard configuration supports 4-20 mA HART loop protocol compatibility alongside high-speed digital drop channels. Integrated shielding prevents electromagnetic interference (EMI) from corrupting data packets across multi-drop loops, ensuring deterministic bus communication and low-latency feedback transmission between field nodes and controller cards.
Frequently Asked Questions
Q: Does the 51202329-302 support hot-swapping on active controller networks?
A: Cabling adjustments must be performed with upstream loop power isolated to prevent communication dropouts or transient bus faults on connected Series C nodes.
Q: What is the maximum communication speed supported by this cable assembly?
A: The physical layer is engineered to support data transmission rates up to 2.304 Mbps under standard industrial operating conditions.
Field Installation Guidelines
- Verify that system power and communication loops are de-energized prior to routing and connecting the cable set between controller nodes and I/O assemblies.
- Route the cable along designated internal cabinet wireways, maintaining physical separation from high-voltage AC power lines to prevent induced noise coupling.
- Secure connector plugs firmly to terminal interfaces, ensuring locking mechanisms or retention screws are fully engaged to withstand industrial vibration environments.
How to Get a Quote
Order Tracking
Shipping Carriers
Refund Policy and Conditions
Warranty Conditions
Related Products
- Choosing a selection results in a full page refresh.