51202329-802 | Honeywell | I/O Link Cable
Specifications
Manufacturer: Honeywell
Product No.: 51202329-802
Condition: 10 Items in Stock
Product Type: Industrial Computer Cables
Payment:T/T, Western Union
Weight: 90g
Shipping port: Xiamen
Warranty: 12 months
Product details
Description
Configured for power distribution and link protection interconnection in process automation networks, the Honeywell 51202329-802 (51202329-802 Cable Set PM Power with Link Protect REV C) provides direct physical signal transmission and power routing across control cabinet nodes.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 51202329-802 |
| Brand | Honeywell |
| Origin | United States |
| Weight | 0.09 kg (approx. 0.20 lbs) |
| Dimensions | Standard industrial cabinet length |
| Operating Temp | 0 deg C to 60 deg C |
| Power Consumption | Passive cabling component |
| Cable Type | PM Power with Link Protect (REV C) |
| Interface Compatibility | Process Manager power distribution assemblies |
Honeywell DCS Process Control and Signal Communication
The assembly integrates within Honeywell process automation architecture, maintaining strict channel-to-channel isolation and cold junction compensation (CJC) path integrity across distributed nodes. Standard configuration supports 4-20 mA HART loop protocol environments alongside power distribution layers. The physical wiring architecture ensures deterministic bus operation and low-latency power delivery between module power supplies and link protector hardware.
Frequently Asked Questions
Q: Does the 51202329-802 support hot-swapping on active controller networks?
A: Cabling adjustments must be performed with upstream loop power and power distribution buses isolated to prevent electrical arcing or transient voltage spikes on connected control nodes.
Q: Is this cable set compatible with link protection module assemblies?
A: Yes, this specific variant is engineered explicitly to connect PM power distribution systems featuring inline link protection (REV C).
Field Installation Guidelines
- Verify that system power supplies and distribution loops are de-energized prior to routing and connecting the cable set between controller nodes and power assemblies.
- Route the cable along designated internal cabinet wireways, maintaining physical separation from high-voltage AC power lines to prevent induced noise coupling.
- Secure connector plugs firmly to terminal interfaces, ensuring locking mechanisms or retention screws are fully engaged to withstand industrial vibration environments.
How to Get a Quote
Order Tracking
Shipping Carriers
Refund Policy and Conditions
Warranty Conditions
Related Products
- Choosing a selection results in a full page refresh.