Honeywell 51202329-102 I/O Link Cable Set

Specifications

  • Manufacturer: Honeywell

  • Product No.: 51202329-102

  • Condition: 10 Items in Stock

  • Product Type: PLC Battery/Cable/Accessories

  • Payment:T/T, Western Union

  • Weight: 1500g

  • Shipping port: Xiamen

  • Warranty: 12 months

Product details

Description

Configured for high-performance communication between field devices and controller architectures in industrial automation networks, the Honeywell 51202329-102 (51202329-102) I/O Link Cable Set provides direct physical connectivity supporting up to 6 link devices and 2 redundant UIO IOTA assemblies.

Hardware Specifications

Parameter Specification
Model 51202329-102
Brand Honeywell
Origin United States
Weight 0.1 kg
Dimensions 1.5 meter length (6 inch pitch between drop points)
Operating Temp -40 deg C to 85 deg C
Power Consumption Passive cabling component
Device Capacity Up to 6 I/O link drops
Interface Compatibility Compatible with up to 2 redundant UIO IOTA

Process Control and Signal Communication Interfaces

The assembly integrates within Honeywell process automation platforms, maintaining rigorous channel-to-channel isolation and signal integrity across distributed nodes. Standard configuration supports multi-drop communication loops where internal shielding prevents electromagnetic interference (EMI) from corrupting data packets. The physical wiring architecture ensures deterministic bus traversal without introducing latency or feedback degradation across the connected I/O modules.

Frequently Asked Questions

Q: Does the 51202329-102 support hot-swapping on active controller networks?

A: Cabling adjustments must be performed with upstream loop power isolated to prevent communication dropouts or transient bus faults on connected IOTA nodes.

Q: What is the maximum device drop limit supported by this cable set?

A: The harness accommodates up to 6 individual I/O link devices with a fixed 6-inch pitch between connection points.

Field Installation Guidelines

  1. Verify that system power and communication loops are de-energized prior to routing and connecting the cable set between controller nodes and UIO IOTA assemblies.
  2. Route the 1.5 meter cable along designated internal cabinet wireways, maintaining physical separation from high-voltage AC power lines to prevent induced noise coupling.
  3. Secure connector plugs firmly to terminal interfaces, ensuring locking mechanisms or retention screws are fully engaged to withstand industrial vibration environments.

How to Get a Quote

Order Tracking

Shipping Carriers

Refund Policy and Conditions

Warranty Conditions

Related Products