Honeywell I/O Link Cable Pair | 51202329-212
Specifications
Manufacturer: Honeywell
Product No.: 51202329-212
Condition: 10 Items in Stock
Product Type: PLC Battery/Cable/Accessories
Payment:T/T, Western Union
Weight: 200g
Shipping port: Xiamen
Warranty: 12 months
Product details
Description
Configured for stable communication and data exchange between control devices in industrial automation systems, the Honeywell 51202329-212 (51202329-212 I/O Link Cable Pair) provides direct physical signal transmission and power routing across distributed nodes.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 51202329-212 |
| Brand | Honeywell |
| Origin | United States |
| Weight | 0.2 kg (estimated) |
| Dimensions | 3 meters (9.8 feet) length |
| Operating Temp | -20 deg C to 80 deg C |
| Power Consumption | Passive cabling component (2 A per conductor) |
| Voltage Rating | 300 V |
| Conductor Configuration | 4 conductors, 22 AWG, violet jacket |
| Drop Specification | 9 inches (229 mm) distance, 4 drops |
Process Control and Signal Communication Interfaces
The assembly integrates within Honeywell process control architectures, maintaining precise signal integrity across field sensors, actuators, and master controllers. Standard configuration supports multi-drop communication loops where integrated shielding prevents electromagnetic interference (EMI) from corrupting transmitted data packets. The physical wiring architecture ensures deterministic bus traversal without introducing latency or feedback degradation across the connected I/O links.
Frequently Asked Questions
Q: Does the 51202329-212 support hot-swapping on active controller networks?
A: Cabling adjustments must be performed with upstream loop power isolated to prevent communication dropouts or transient bus faults on connected IOTA nodes.
Q: What is the maximum conductor current capacity for this cable assembly?
A: The internal 22 AWG conductors are rated for up to 2 A per conductor under standard industrial operating conditions.
Field Installation Guidelines
- Verify that system power and communication loops are de-energized prior to routing and connecting the cable set between controller nodes and terminal assemblies.
- Route the 3-meter cable along designated internal cabinet wireways, maintaining physical separation from high-voltage AC power lines to prevent induced noise coupling.
- Secure connector plugs firmly to terminal interfaces, ensuring locking mechanisms or retention screws are fully engaged to withstand industrial vibration environments.
How to Get a Quote
Order Tracking
Shipping Carriers
Refund Policy and Conditions
Warranty Conditions
Related Products
- Choosing a selection results in a full page refresh.